We were tasked with designing and installing 3 large Canopies within the redevelopment schedule to both ensure the development met tight deadlines and to ensure they were fitted to the requirements set out by the design.
The work took a total of 5 days to complete which was ahead of the schedule supporting the completion of the development.
Job details
- 3 x various Cantilevered Shelters
- White GRP Beams fitted with High Tolerance Strength Bolts
- 90% GRP opaque Sheeting to cover area
- Guttering fitted round edges to control water-flow to the drainage system
- Adaptations made to ensure sealed and secured safely.